Peripheral interface adaptation
Check both interface standards and the full pin mapping; a passive adapter does not convert protocols.
Explore products in this family. Open a product for details, or send us your drawing for a custom build.
| Part number | Description |
|---|---|
| 185434-01 | CBL ASSY LV6-BAN4 1M |
| 788280-02 | SHDB13W6-4BNCM, LOW NOISE DSUB T |
| 140151-0R91 | CBL ASSY EXTENDED TEMP |
| 145230-05 | CBL ASSY M12 TO RJ45 |
| 788280-04 | SHDB13W6-4BNCM, LOW NOISE DSUB T |
| 776784-05 | CBL ASSY SHIELDED 5M |
| EM746113 | CBL ASSY 20PIN J-TAG |
| 140304-0R2 | CBL ASSY INFINIBAND 0.2M |
| 189919-0R5 | CBL ASSY 9P DIN TO 2 BNC F |
| 140150-0R91 | CBL ASSY EXT TEMP BNCM |
| 194123-01 | CBL ASSY MFIT-PIGTAIL 14PIN |
| 140151-2R4 | CBL ASSY EXT TEMP MXLRF |
| 781692-01 | LFH160 TO 50-PIN D-SUB FOR NI PX |
| XLRF10TRS | CBL ASY TRS 3P M TO XLR 3P F 10' |
| DB25FTRS | CBL ASSY TRS M TO D-SUB 25P F 6' |
| DB25FXLRMXLRF | CBL ASY 3P F & 3P M-25P F 6' |
| L115PSJT1224F0L115R | CBL ASSY |
| VGAMM15A-C | 15ft VGA Male to VGA Male Black |
| VGA2DVIW-C-5PK | 5-Pack of VGA Male to DVI-I (29 |
| VGASPLMFF-C-5PK | 5-Pack of VGA Male to 2xVGA Fema |
| VGAMM15A-C-5PK | 5-Pack of 15ft VGA Male to VGA M |
| VGAMM50-C | 50ft VGA Male to VGA Male Black |
| VGAMM15-C | 15ft VGA Male to VGA Male Black |
| VGASPLMFF-C | VGA Male to 2xVGA Female Black A |
Between-Series Adapter Cables includes cable assemblies with different connector series at their two ends.
When selecting an assembly, check both interface standards, pin mapping, shielding and any required conversion.
A change of connector format does not prove protocol, signal-level or power conversion. Confirm whether the selected assembly is passive or contains conversion electronics.
Potential uses vary by part number. Check the listed specifications and equipment requirements before selecting a product.
Check both interface standards and the full pin mapping; a passive adapter does not convert protocols.
Confirm each breakout connection against the instrument pin assignment and shielding requirements.
Verify electrical levels and connector functions before integrating the equipment.
Compare the source and destination signals before deciding whether conversion electronics are required.
Compare the interfaces, construction and selection details of these two product options.
Representative listed part: 1300480291.
Representative listed part: 1300480369.
The comparison describes common construction differences; final suitability depends on your electrical, mechanical and lifetime requirements.
Practical answers to help you prepare your drawing and specifications.
Confirm the source and destination interfaces, signal assignment and equipment requirements. A cable listing that connects two connector series is not, by itself, evidence of electronic conversion or protocol compatibility.
Read the complete Connector Type entry, including position and contact counts. Obtain or compare the wiring diagram so each required signal reaches the intended contact at the other end.
Review the listed Shielding and Cable Type together with both connector terminations. If grounding continuity or shield termination is important, include that requirement in the enquiry and request confirmation for the exact part.
A change of connector format does not prove protocol, signal-level or power conversion. Confirm whether the selected assembly is passive or contains conversion electronics.
1300480291 is shown as shielded adapter cables, with Shielding listed as Shielded. 1300480369 is shown as unshielded adapter cables, with Shielding listed as Unshielded. These are two examples, not a statement that every part has either specification.
Provide the original manufacturer and complete part number, or a drawing. For this range, compare both interface standards, pin mapping, shielding and any required conversion. Identify any requirement not covered by the listing rather than selecting only by length or appearance.
Supply a mating-interface drawing and the required both interface standards, pin mapping, shielding and any required conversion. Add quantity, destination and any inspection requirements. Changes must be reviewed for the selected construction before compatibility, pricing or delivery can be confirmed.
Send a drawing, a BOM, a part number or just one sentence. Our engineers review every enquiry and reply within 24 hours.
We use cookies to collect information about how you use this site. We use this information to make the website work as well as possible and improve our services.more details