Terminal Crimping
Force-monitored crimping for Molex, JST, Hirose, JAE and TE terminals. Open-barrel, closed-barrel and insulation-displacement terminals are processed with controlled tooling, pull-force checks and micro-section verification.
Our core production and testing processes are coordinated on one site, making it easier to review process settings and batch records when an issue needs investigation.
Force-monitored crimping for Molex, JST, Hirose, JAE and TE terminals. Open-barrel, closed-barrel and insulation-displacement terminals are processed with controlled tooling, pull-force checks and micro-section verification.
Vertical injection overmolding in TPU, PVC, TPE and silicone for sealed strain relief, custom profiles and IP-rated cable transitions. Tooling and material selection are reviewed for each application.
Precision processing for 36–48AWG micro coaxial cable, including laser stripping, controlled-force termination and signal-integrity sampling for camera, medical imaging and high-speed display applications.
Every assembly is verified through point-to-point continuity, insulation resistance and high-potential testing. Test programmes and inspection records remain traceable to the corresponding production batch.
Explore the equipment and inspection resources used across our cable and harness projects. Available capacity for a specific programme is confirmed during quotation.
Vertical molding machines
Crimping machines & presses
Automated testers
Production operators
A dedicated bench and small press support sample builds while the production schedule is planned separately. Sample timing is confirmed for each project.
Microscopes, crimp height gauges, pull-force testers and micro-section preparation let us inspect the joint itself, not just the outside of it.
Batch records link finished assemblies back to wire reels and terminal batches, so a field failure can be narrowed to a production window.
Share a drawing, BOM or sample. Our engineers can review the construction and discuss manufacturing and testing requirements before production.
Prefer to read first? See our buyer guides on crimping, standards and scaling a cable programme.
Send a drawing, a BOM, a part number or just one sentence. Our engineers review every enquiry and reply within 24 hours.
We use cookies to collect information about how you use this site. We use this information to make the website work as well as possible and improve our services.more details