Peripheral interface adaptation
Check both interface standards and the full pin mapping; a passive adapter does not convert protocols.
Explore products in this family. Open a product for details, or send us your drawing for a custom build.
| Part number | Description |
|---|---|
| P602-006 | CABLE PARALLEL DB25M - CEN36M 6' |
| P604-006 | CABLE PARALLEL DB25M - CEN36M 6' |
| AK-Y1202 | CABLE HPD50 MALE-CENTRON 50 MALE |
| 5601-22-127-200 | CABLE SATA POWER 15POS 8" |
| AK3440-.8 | CABLE SCSI INT/EXT BRACKET .8M |
| 366970021 | CABLE ASSEM HANDYLINK-USB PLUG |
| 7314420 | CABLE USB TYPE-A TO 2MM CONN 96" |
| 4963-E-48 | CBL ASSY BNC PLUG-JACK RG59B 4' |
| 4963-E-24 | CBL ASSY BNC PLUG-JACK RG59B 24" |
| 1201088339 | M12-4P(D)-MM ST/RJ45 15M |
| 6888-300 | CABLE XLR JACK/ 1/4" STEREO PLUG |
| 4280N-36 | PJ051/BANTAM PLUGS 36" NICKEL |
| AK553-2-R | CABLE VGA TO 5 X BNC MONITOR 2M |
| 6888-180 | CABLE XLR JACK/ 1/4" STEREO PLUG |
| 6328-96 | PLUG DUAL BANTAM/SINGLE WE310 |
| 6318-96 | PLUGS WE310 Y/15-PIN FMALE CABLE |
| 6323-96 | PLUG BANTAM/RJ11 CONN CABLE 96" |
| 4280N-48 | PJ051/BANTAM PLUGS 48" NICKEL |
| 6324-96 | PLUG BANTAM-RJ48/RJ45 CABLE 96" |
| 4280N-60 | PJ051/BANTAM PLUGS 60" NICKEL |
| 6317-96 | PLUGS WE310 Y/9-PIN MALE CABLE |
| 4280-36 | PJ051/BANTAM PHONE PLUGS 36" |
| 4280-72 | PJ051/BANTAM PHONE PLUGS 72" |
| 4963-E-60 | CBL ASSY BNC PLUG-JACK RG59B 5' |
Between-Series Adapter Cables includes cable assemblies with different connector series at their two ends.
When selecting an assembly, check both interface standards, pin mapping, shielding and any required conversion.
A change of connector format does not prove protocol, signal-level or power conversion. Confirm whether the selected assembly is passive or contains conversion electronics.
Potential uses vary by part number. Check the listed specifications and equipment requirements before selecting a product.
Check both interface standards and the full pin mapping; a passive adapter does not convert protocols.
Confirm each breakout connection against the instrument pin assignment and shielding requirements.
Verify electrical levels and connector functions before integrating the equipment.
Compare the source and destination signals before deciding whether conversion electronics are required.
Compare the interfaces, construction and selection details of these two product options.
Representative listed part: 1300480291.
Representative listed part: 1300480369.
The comparison describes common construction differences; final suitability depends on your electrical, mechanical and lifetime requirements.
Practical answers to help you prepare your drawing and specifications.
Confirm the source and destination interfaces, signal assignment and equipment requirements. A cable listing that connects two connector series is not, by itself, evidence of electronic conversion or protocol compatibility.
Read the complete Connector Type entry, including position and contact counts. Obtain or compare the wiring diagram so each required signal reaches the intended contact at the other end.
Review the listed Shielding and Cable Type together with both connector terminations. If grounding continuity or shield termination is important, include that requirement in the enquiry and request confirmation for the exact part.
A change of connector format does not prove protocol, signal-level or power conversion. Confirm whether the selected assembly is passive or contains conversion electronics.
1300480291 is shown as shielded adapter cables, with Shielding listed as Shielded. 1300480369 is shown as unshielded adapter cables, with Shielding listed as Unshielded. These are two examples, not a statement that every part has either specification.
Provide the original manufacturer and complete part number, or a drawing. For this range, compare both interface standards, pin mapping, shielding and any required conversion. Identify any requirement not covered by the listing rather than selecting only by length or appearance.
Supply a mating-interface drawing and the required both interface standards, pin mapping, shielding and any required conversion. Add quantity, destination and any inspection requirements. Changes must be reviewed for the selected construction before compatibility, pricing or delivery can be confirmed.
Send a drawing, a BOM, a part number or just one sentence. Our engineers review every enquiry and reply within 24 hours.
We use cookies to collect information about how you use this site. We use this information to make the website work as well as possible and improve our services.more details